Installation guideline
For perfect installed honeycomb pavers we recommend to works as follows:
- Excavation at desired floor level (-580mm)
- Bulldoze the surface and compress with a compactor
- Insert wet mix aggregate, level and compress it
- Insert grit and compress it
- Install the honeycomb paver
- Fill in natural soil, ground soil, grit etc.
- Sowing (if desired)
Additional information
PDF Downloads
Specification
Product movies